Sometimes the amount of trains
on the sub can exceed the capacity of Hobson Yard's fueling racks.
This is when things can get backed up. Check out the four trains
in this shot. Two inbound loads, the far one with a DPU unit
on the rear, and two outbound empty trains wait out other traffic.
Four trains in one shot isn't something that happens often.